United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
BATTERY STORAGE Β· SPPBattery storage project GEN-2022-230, Logan County
Battery storage project GEN-2022-230, Logan County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Logan County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedJun 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-230
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Sooner to Spring Creek Power Plant 345 kV line
- Location
- Logan County, Oklahoma
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 February 2023
- Proposed online date
- September 2028
- Withdrawn
- June 2023
Location
Marker shows the centre of Logan County; the queue data does not give exact sites.
Other requests in Logan County
- Battery storage project GEN-2024-029, Logan CountyBattery storage Β· 150 MW Β· in study
- Gas project GEN-2013-012, Logan CountyGas Β· 147 MW Β· built
- Solar project GEN-2022-228, Logan CountySolar Β· 335 MW Β· withdrawn
- Solar project GEN-2018-127, Logan CountySolar Β· 200 MW Β· withdrawn
- Solar project GEN-2018-076, Logan CountySolar Β· 200 MW Β· withdrawn
- Battery storage project GEN-2022-229, Logan CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project GEN-2022-231, Logan CountySolar Β· 166 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem