United States › Grid › Interconnection queues › Oregon

ONSHORE WIND · WEST

Onshore wind project 12-053, Polk County

Onshore wind project 12-053, Polk County is a 87.5 MW onshore wind request suspended in the West interconnection queue, in Polk County, Oregon, connecting to Portland General Electric.

Queue statusPaused / redesign
  1. PlanningQueued Oct 2012 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2015 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
12-053
Grid region
West (non-ISO utilities)
Utility / transmission owner
Portland General Electric
Connection point (POI)
Grand Ronde - Willamina 57 kV Switching Station
Location
Polk County, Oregon
Technology
Wind: 87.5 MW
Total requested
87.5 MW
Service type
Network resource (NRIS)
Queue status
Suspended
Entered queue
25 October 2012
Proposed online date
December 2015

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Oregon · Transmission lines in Oregon

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem