United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· MISOSolar project J3958, Sullivan County
Solar project J3958, Sullivan County is a 300 MW solar request withdrawn in the MISO interconnection queue, in Sullivan County, Missouri, connecting to AMEREN MISSOURI.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2025 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3958
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN MISSOURI
- Connection point (POI)
- Other_
- Location
- Sullivan County, Missouri
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 17 April 2025
- Proposed online date
- November 2029
- Withdrawn
- October 2025
Location
Marker shows the centre of Sullivan County; the queue data does not give exact sites.
Other requests in Sullivan County
- Solar project E0013, Sullivan CountySolar Β· 310 MW Β· in study
- Solar project J3957, Sullivan CountySolar Β· 300 MW Β· in study
- Onshore wind project GI-46, Sullivan CountyOnshore wind Β· 88.8 MW Β· withdrawn
- Onshore wind project GI-64, Sullivan CountyOnshore wind Β· 77.5 MW Β· withdrawn
- Onshore wind project GI-49, Sullivan CountyOnshore wind Β· 77.5 MW Β· withdrawn
- Onshore wind project GI-56, Sullivan CountyOnshore wind Β· 77.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem