Solar + storage project 34

Solar + storage project 34 is a 14.0 MW solar + storage request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
34
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
WREC Pasco Trails/WREC Hays 115 kV
Location
Florida
Technology
Solar: 14.0 MW Β· Battery
Total requested
14.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: System Impact/Facilities; Status: Withdrawn
Queue status
Withdrawn
Entered queue
13 November 2023
Proposed online date
June 2026

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem