United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 34
Solar + storage project 34 is a 14.0 MW solar + storage request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 34
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- WREC Pasco Trails/WREC Hays 115 kV
- Location
- Florida
- Technology
- Solar: 14.0 MW Β· Battery
- Total requested
- 14.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: System Impact/Facilities; Status: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 13 November 2023
- Proposed online date
- June 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem