πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

BATTERY STORAGE Β· WEST

Battery storage project C2-69, Davis County

Battery storage project C2-69, Davis County is a 150 MW battery storage request withdrawn in the West interconnection queue, in Davis County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-69
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Syracuse substation
Location
Davis County, Utah
Technology
Battery: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
10 May 2022
Proposed online date
June 2024

Location

Marker shows the centre of Davis County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Davis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem