United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOGenovia Storage
Genovia Storage is a 300 MW battery storage request withdrawn in the NYISO interconnection queue, in Genesee County, New York, connecting to NYPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-258
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYPA
- Developer
- Genovia Storage LLC
- Connection point (POI)
- QP580_POI2 - Q721_POI 345 kV Line
- Location
- Genesee County, New York
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Queue status
- Withdrawn
- Entered queue
- 23 September 2024
Location
Marker shows the centre of Genesee County; the queue data does not give exact sites.
Other requests in Genesee County
- Cider SolarSolar · 500 MW · in study
- Excelsior Energy CenterSolar · 280 MW · in study
- Brusselville Solar Energy CenterSolar + storage · 170 MW · in study
- Alabama Solar Park LLCSolar · 130 MW · in study
- Heritage WindOnshore wind · 126 MW · in study
- Transit SolarSolar · 20.0 MW · in study
- Genesee Wind FarmOnshore wind · 500 MW · withdrawn
- GenWy Wind FarmOnshore wind · 479 MW · withdrawn
- Genovia StorageBattery storage · 300 MW · withdrawn
- Genovia StorageBattery storage · 300 MW · withdrawn
- Sweet Valley SolarSolar · 200 MW · withdrawn
- Sweet Valley StorageBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem