United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR + STORAGE Β· PJMSolar + storage project AE1-198, Mchenry County
Solar + storage project AE1-198, Mchenry County is a 357 MW solar + storage request withdrawn in the PJM interconnection queue, in Mchenry County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedSep 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-198
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Crete 345 kV
- Location
- Mchenry County, Illinois
- Technology
- Solar: 357 MW Β· Battery
- Total requested
- 357 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 26 September 2018
- Proposed online date
- September 2021
- Withdrawn
- September 2022
Location
Marker shows the centre of Mchenry County; the queue data does not give exact sites.
Other requests in Mchenry County
- Battery storage project AG2-545, Mchenry CountyBattery storage Β· 400 MW Β· in study
- Pleasant Grove SolarSolar Β· 300 MW Β· in study
- Battery storage project AI1-149, Mchenry CountyBattery storage Β· 250 MW Β· in study
- Battery storage project AG2-544, Mchenry CountyBattery storage Β· 200 MW Β· in study
- Solar project AH1-196, Mchenry CountySolar Β· 150 MW Β· in study
- Battery storage project AH2-121, Mchenry CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AH2-120, Mchenry CountyBattery storage Β· 100 MW Β· in study
- Solar + storage project AH2-197, Mchenry CountySolar + storage Β· 50.0 MW Β· in study
- Solar project AI1-077, Mchenry CountySolar Β· 15.8 MW Β· in study
- McHenry Energy StorageBattery storage Β· 20.0 MW Β· built
- Marengo Battery StorageBattery storage Β· 20.0 MW Β· built
- Gas project Z2-041, Mchenry CountyGas Β· 455 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem