United States › Grid › Interconnection queues › Washington
ONSHORE WIND · WESTNextEra Energy Resources
NextEra Energy Resources is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Walla Walla County, Washington, connecting to NextEra Energy Resources, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G88
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NextEra Energy Resources, LLC
- Developer
- NextEra Energy Resources, LLC
- Connection point (POI)
- Sacajawea Substation
- Location
- Walla Walla County, Washington
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 21 November 2001
- Proposed online date
- September 2002
Location
Marker shows the centre of Walla Walla County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Walla Walla County
- Other project G0924, Walla Walla CountyOther · 300 MW · in study
- Other project G0925, Walla Walla CountyOther · 300 MW · in study
- Other project G0923, Walla Walla CountyOther · 300 MW · in study
- Solar project G0935, Walla Walla CountySolar · 225 MW · in study
- Hydro project G0535, Walla Walla CountyHydro · 210 MW · in study
- Battery storage project S0027, Walla Walla CountyBattery storage · 210 MW · in study
- Onshore wind project G0671, Walla Walla CountyOnshore wind · 200 MW · in study
- Onshore wind project T2-022, Walla Walla CountyOnshore wind · 100 MW · in study
- Onshore wind project 1, Walla Walla CountyOnshore wind · 210 MW · built
- Onshore wind project 16, Walla Walla CountyOnshore wind · 98.9 MW · built
- City of Walla Walla Mill Creek HydroelectricHydro · 3.0 MW · built
- Gas project G0281, Walla Walla CountyGas · 760 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem