United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2022-166, Garvin County
Solar project GEN-2022-166, Garvin County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Garvin County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedJun 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-166
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Paoli - Baseline 138 kV Substation
- Location
- Garvin County, Oklahoma
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 26 February 2023
- Proposed online date
- October 2028
- Withdrawn
- June 2023
Location
Marker shows the centre of Garvin County; the queue data does not give exact sites.
Other requests in Garvin County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem