United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J151, Moody County
Onshore wind project J151, Moody County is a 350 MW onshore wind request withdrawn in the MISO interconnection queue, in Moody County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2010 (completed)
- Withdrawn / abandonedDec 2012 (project stopped here)
- ConsentedDec 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J151
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Split Rock Substation
- Location
- Moody County, South Dakota
- Technology
- Wind: 350 MW
- Total requested
- 350 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 28 June 2010
- Agreement signed
- 27 December 2012
- Proposed online date
- May 2011
- Withdrawn
- December 2012
Location
Marker shows the centre of Moody County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Moody County