BATTERY STORAGE Β· MISOBattery storage project J2335, Portage County
Battery storage project J2335, Portage County is a 200 MW battery storage request withdrawn in the MISO interconnection queue, in Portage County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2335
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- Plover 115 kV Substation (J1573 substation)
- Location
- Portage County, Wisconsin
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- September 2025
- Withdrawn
- July 2025
Location
Marker shows the centre of Portage County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Portage County
- Solar project J1752, Portage CountySolar Β· 148 MW Β· under construction
- Solar project J1573, Portage CountySolar Β· 250 MW Β· agreement signed
- Solar project J2107, Portage CountySolar Β· 399 MW Β· in study
- Solar project J2099, Portage CountySolar Β· 399 MW Β· in study
- Solar project J2185, Portage CountySolar Β· 399 MW Β· in study
- Gas project J2944, Portage CountyGas Β· 350 MW Β· in study
- Gas project G254, Portage CountyGas Β· 590 MW Β· withdrawn
- Coal project G522, Portage CountyCoal Β· 550 MW Β· withdrawn
- Coal project G295, Portage CountyCoal Β· 525 MW Β· withdrawn
- Other project G050, Portage CountyOther Β· 320 MW Β· withdrawn
- Solar project J2366, Portage CountySolar Β· 160 MW Β· withdrawn
- Solar project J1938, Portage CountySolar Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem