United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
GAS Β· MISOGas project G254, Portage County
Gas project G254, Portage County is a 590 MW gas request withdrawn in the MISO interconnection queue, in Portage County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2002 (completed)
- Withdrawn / abandonedJun 2003 (project stopped here)
- ConsentedJun 2003 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G254
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Portage County, Wisconsin
- Technology
- Gas: 590 MW
- Total requested
- 590 MW
- Queue status
- Withdrawn
- Entered queue
- 16 December 2002
- Agreement signed
- 30 June 2003
- Proposed online date
- January 2003
- Withdrawn
- June 2003
Location
Marker shows the centre of Portage County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Portage County
- Solar project J1752, Portage CountySolar Β· 148 MW Β· under construction
- Solar project J1573, Portage CountySolar Β· 250 MW Β· agreement signed
- Solar project J2107, Portage CountySolar Β· 399 MW Β· in study
- Solar project J2099, Portage CountySolar Β· 399 MW Β· in study
- Solar project J2185, Portage CountySolar Β· 399 MW Β· in study
- Gas project J2944, Portage CountyGas Β· 350 MW Β· in study
- Coal project G522, Portage CountyCoal Β· 550 MW Β· withdrawn
- Coal project G295, Portage CountyCoal Β· 525 MW Β· withdrawn
- Other project G050, Portage CountyOther Β· 320 MW Β· withdrawn
- Battery storage project J2335, Portage CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J2366, Portage CountySolar Β· 160 MW Β· withdrawn
- Solar project J1938, Portage CountySolar Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem