United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project H042, Waseca County

Onshore wind project H042, Waseca County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Waseca County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedOct 2011 (project stopped here)
  3. ConsentedOct 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H042
Grid region
MISO (Midcontinent)
Connection point (POI)
St. Olaf Lake 69 kV 3 way junction
Location
Waseca County, Minnesota
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
12 June 2008
Agreement signed
12 October 2011
Proposed online date
September 2012
Withdrawn
October 2011

Location

Marker shows the centre of Waseca County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Waseca County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem