United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

SOLAR Β· MISO

Solar project J345, Waseca County

Solar project J345, Waseca County is a 40.0 MW solar request withdrawn in the MISO interconnection queue, in Waseca County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2014 (completed)
  2. Withdrawn / abandonedSep 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J345
Grid region
MISO (Midcontinent)
Connection point (POI)
69 kV bus at Meriden Substation
Location
Waseca County, Minnesota
Technology
Solar: 40.0 MW
Total requested
40.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
19 May 2014
Proposed online date
July 2016
Withdrawn
September 2014

Location

Marker shows the centre of Waseca County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Waseca County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem