United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

GAS Β· MISO

Gas project G337, Waseca County

Gas project G337, Waseca County is a 55.0 MW gas request withdrawn in the MISO interconnection queue, in Waseca County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2003 (completed)
  2. Withdrawn / abandonedMar 2004 (project stopped here)
  3. ConsentedMar 2004 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G337
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Waseca County, Minnesota
Technology
Gas: 55.0 MW
Total requested
55.0 MW
Queue status
Withdrawn
Entered queue
17 April 2003
Agreement signed
26 March 2004
Proposed online date
December 2005
Withdrawn
March 2004

Location

Marker shows the centre of Waseca County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Waseca County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem