United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2021-SR4, Le Flore County
Solar project GEN-2021-SR4, Le Flore County is a 22.2 MW solar request withdrawn in the SPP interconnection queue, in Le Flore County, Oklahoma.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedSep 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingOct 2022 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-SR4
- Grid region
- SPP (Southwest Power Pool)
- Location
- Le Flore County, Oklahoma
- Technology
- Solar: 22.2 MW
- Total requested
- 22.2 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 12 February 2021
- Proposed online date
- October 2022
- Came online
- October 2022
- Withdrawn
- September 2021
Location
Marker shows the centre of Le Flore County; the queue data does not give exact sites.
Other requests in Le Flore County
- Solar + storage project GEN-2023-064, Le Flore CountySolar + storage Β· 200 MW Β· in study
- Gas project GEN-2024-286, Le Flore CountyGas Β· 136 MW Β· in study
- Onshore wind project GEN-2016-028, Le Flore CountyOnshore wind Β· 100 MW Β· built
- Coal project GEN-2008-030, Le Flore CountyCoal Β· 660 MW Β· withdrawn
- Coal project GEN-2006-042, Le Flore CountyCoal Β· 600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem