🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Georgia

SOLAR + STORAGE · SOUTHEAST

Cherry Blossom Solar

Cherry Blossom Solar is a 150 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Twiggs County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Aug 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingApr 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-142
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Danville 115 kV Substation
Location
Twiggs County, Georgia
Technology
Solar: 150 MW · Battery
Total requested
150 MW
Study phase
FSA Issued
Queue status
Active
Entered queue
13 August 2020
Proposed online date
June 2023
Came online
April 2023

Location

Marker shows the centre of Twiggs County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Twiggs County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem