United States βΊ Grid βΊ Interconnection queues βΊ Michigan
ONSHORE WIND Β· MISOOnshore wind project J1068, Washtenaw County
Onshore wind project J1068, Washtenaw County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Washtenaw County, Michigan, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedNov 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1068
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Dorset 120 kV Substation
- Location
- Washtenaw County, Michigan
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- October 2020
- Withdrawn
- November 2019
Location
Marker shows the centre of Washtenaw County; the queue data does not give exact sites.
Other requests in Washtenaw County
- Solar project J799, Washtenaw CountySolar Β· 189 MW Β· under construction
- Solar project J1224, Washtenaw CountySolar Β· 170 MW Β· under construction
- Battery storage project J1659, Washtenaw CountyBattery storage Β· 100 MW Β· under construction
- Battery storage project J1329, Washtenaw CountyBattery storage Β· 20.0 MW Β· under construction
- Solar project J1062, Washtenaw CountySolar Β· 200 MW Β· agreement signed
- Gas project J3923, Washtenaw CountyGas Β· 1,414 MW Β· in study
- Solar project J3945, Washtenaw CountySolar Β· 245 MW Β· in study
- Surplus; J1062Other Β· 150 MW Β· in study
- Battery storage project J3009, Washtenaw CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J3654, Washtenaw CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J1844, Washtenaw CountyBattery storage Β· 100 MW Β· in study
- Surplus; J1224/J1329Other Β· 85.1 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem