United States βΊ Grid βΊ Interconnection queues βΊ Washington
SOLAR Β· WESTSolar project 422, Yakima County
Solar project 422, Yakima County is a 5.0 MW solar request withdrawn in the West interconnection queue, in Yakima County, Washington, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 422
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit 5Y243, West Rural circuit, out of Toppenish substation
- Location
- Yakima County, Washington
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 29 March 2012
- Proposed online date
- June 2015
Location
Marker shows the centre of Yakima County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Yakima County
- Solar + storage project 1008, Yakima CountySolar + storage Β· 94.0 MW Β· agreement signed
- Solar project TCS-14, Yakima CountySolar Β· 5.0 MW Β· agreement signed
- Solar + storage project G1087, Yakima CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G1082, Yakima CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1080, Yakima CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1081, Yakima CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1083, Yakima CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0817, Yakima CountySolar + storage Β· 325 MW Β· in study
- Solar + storage project C1-40, Yakima CountySolar + storage Β· 150 MW Β· in study
- Solar + storage project G0596, Yakima CountySolar + storage Β· 112 MW Β· in study
- Battery storage project C2-204, Yakima CountyBattery storage Β· 100 MW Β· in study
- Solar project G1010, Yakima CountySolar Β· 70.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem