BATTERY STORAGE Β· WEST

Battery storage project Q24, Pinal County

Battery storage project Q24, Pinal County is a 533 MW battery storage request withdrawn in the West interconnection queue, in Pinal County, Arizona, connecting to Salt River Project.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q24
Grid region
West (non-ISO utilities)
Utility / transmission owner
Salt River Project
Connection point (POI)
Pinal Central 230 kV
Location
Pinal County, Arizona
Technology
Battery: 533 MW
Total requested
533 MW
Queue status
Withdrawn
Entered queue
27 September 2022
Proposed online date
March 2026

Location

Marker shows the centre of Pinal County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Pinal County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem