Solar project GI-80, Callaway County

Solar project GI-80, Callaway County is a 250 MW solar request withdrawn in the Southeast interconnection queue, in Callaway County, Missouri, connecting to Associated Electric Cooperative, Incorporated.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-80
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Associated Electric Cooperative, Incorporated
Connection point (POI)
McCredie 345 kV
Location
Callaway County, Missouri
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
18 January 2019
Proposed online date
April 2021

Location

Marker shows the centre of Callaway County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Callaway County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem