United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSeven Bridges Solar
Seven Bridges Solar is a 17.0 MW solar request withdrawn in the PJM interconnection queue, in Mecklenburg County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-182
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Briery-Clover 230 kV
- Location
- Mecklenburg County, Virginia
- Technology
- Solar: 17.0 MW
- Total requested
- 17.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 18 March 2019
- Proposed online date
- December 2025
- Withdrawn
- June 2024
Location
Marker shows the centre of Mecklenburg County; the queue data does not give exact sites.
Other requests in Mecklenburg County
- Battery storage project AJ1-003, Mecklenburg CountyBattery storage Β· 100 MW Β· in study
- Solar project AG2-659, Mecklenburg CountySolar Β· 80.0 MW Β· in study
- Battery storage project AJ1-001, Mecklenburg CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project AG2-341, Mecklenburg CountyBattery storage Β· 50.0 MW Β· in study
- Solar project AJ1-022, Mecklenburg CountySolar Β· 49.0 MW Β· in study
- Solar + storage project AH2-045, Mecklenburg CountySolar + storage Β· 40.0 MW Β· in study
- Solar project AH2-046, Mecklenburg CountySolar Β· 20.0 MW Β· in study
- Seven Bridges SolarSolar Β· 80.0 MW Β· suspended
- Chase City SolarSolar Β· 80.0 MW Β· built
- Bluestone Farm SolarSolar Β· 49.9 MW Β· built
- John H. Kerr Dam Hydro Units 1(15MW), 2-7(42MW)Hydro Β· 27.0 MW Β· built
- Spanish Grove SolarSolar Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem