United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR + STORAGE Β· MISOSolar + storage project J1830, Pulaski County
Solar + storage project J1830, Pulaski County is a 200 MW solar + storage request withdrawn in the MISO interconnection queue, in Pulaski County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1830
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Kelso - Joppa (Massac) 345 kV line
- Location
- Pulaski County, Illinois
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 23 June 2020
- Proposed online date
- September 2023
- Withdrawn
- September 2024
Location
Marker shows the centre of Pulaski County; the queue data does not give exact sites.
Other requests in Pulaski County
- Battery storage project J3497, Pulaski CountyBattery storage Β· 200 MW Β· in study
- Solar + storage project J3080, Pulaski CountySolar + storage Β· 200 MW Β· in study
- Battery storage project J4137, Pulaski CountyBattery storage Β· 200 MW Β· in study
- Solar + storage project J3254, Pulaski CountySolar + storage Β· 175 MW Β· in study
- Solar project J3276, Pulaski CountySolar Β· 200 MW Β· withdrawn
- Solar project J1799, Pulaski CountySolar Β· 100 MW Β· withdrawn
- Solar project J920, Pulaski CountySolar Β· 100 MW Β· withdrawn
- Solar project J1418, Pulaski CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem