BATTERY STORAGE Β· SPPBattery storage project GEN-2019-076, Johnson County
Battery storage project GEN-2019-076, Johnson County is a 14.0 MW battery storage request withdrawn in the SPP interconnection queue, in Johnson County, Nebraska, connecting to OPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-076
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OPPD
- Connection point (POI)
- S969 South Sterling 69kV Substation
- Location
- Johnson County, Nebraska
- Technology
- Battery: 14.0 MW
- Total requested
- 14.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 May 2019
- Proposed online date
- December 2027
- Withdrawn
- December 2022
Location
Marker shows the centre of Johnson County; the queue data does not give exact sites.
Other requests in Johnson County
- Onshore wind project GEN-2018-119, Johnson CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2018-042, Johnson CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2011-055, Johnson CountyOnshore wind Β· 52.8 MW Β· withdrawn
- Solar project GEN-2019-075, Johnson CountySolar Β· 24.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem