United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2018-042, Johnson County
Onshore wind project GEN-2018-042, Johnson County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Johnson County, Nebraska, connecting to KCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandonedAug 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-042
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- Sibley - Overton 345kV Line Break
- Location
- Johnson County, Nebraska
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 May 2018
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- August 2022
Location
Marker shows the centre of Johnson County; the queue data does not give exact sites.
Other requests in Johnson County
- Onshore wind project GEN-2018-119, Johnson CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2011-055, Johnson CountyOnshore wind Β· 52.8 MW Β· withdrawn
- Solar project GEN-2019-075, Johnson CountySolar Β· 24.0 MW Β· withdrawn
- Battery storage project GEN-2019-076, Johnson CountyBattery storage Β· 14.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem