United States › Grid › Interconnection queues › Illinois

ONSHORE WIND · MISO

Onshore wind project J3856, Wabash County

Onshore wind project J3856, Wabash County is a 235 MW onshore wind request in interconnection study in the MISO interconnection queue, in Wabash County, Illinois, connecting to DUKE ENERGY INDIANA.

Queue statusIn planning
  1. PlanningQueued Dec 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2030 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J3856
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
08GIBSON (PSI) - 7ALBION 345.0kV
Location
Wabash County, Illinois
Technology
Wind: 235 MW
Total requested
235 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
26 December 2024
Proposed online date
April 2030

Location

Marker shows the centre of Wabash County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Wabash County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem