United States › Grid › Interconnection queues › Illinois
SOLAR + STORAGE · MISOSolar + storage project J3076, Wabash County
Solar + storage project J3076, Wabash County is a 500 MW solar + storage request in interconnection study in the MISO interconnection queue, in Wabash County, Illinois, connecting to DUKE ENERGY INDIANA.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3076
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- 08GIBSON (PSI) - 7ALBION 345.0kV
- Location
- Wabash County, Illinois
- Technology
- Solar: 500 MW · Battery
- Total requested
- 500 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- November 2025
Location
Marker shows the centre of Wabash County; the queue data does not give exact sites.
Other requests in Wabash County