United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMExelon Epuron Solar Energy Center
Exelon Epuron Solar Energy Center is a 3.3 MW solar request built and operating in the PJM interconnection queue, in Bucks County, Pennsylvania, connecting to PECO.
Request details
- Queue ID
- T20
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PECO
- Connection point (POI)
- Falls
- Location
- Bucks County, Pennsylvania
- Technology
- Solar: 3.3 MW
- Total requested
- 3.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 30 August 2007
- Proposed online date
- December 2008
- Came online
- April 2008
Location
Marker shows the centre of Bucks County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Bucks County
- Energy MountainBattery storage · 150 MW · suspended
- Ford MillGas · 605 MW · built
- Ford MillGas · 540 MW · built
- Ford MillGas · 101 MW · built
- Ford MillGas · 74.0 MW · built
- Other project J374, Bucks CountyOther · 30.0 MW · built
- Croydon #11,12,21,22,31,32,41,42Other · 6.5 MW · built
- Croydon Generating StationGas · 5.0 MW · built
- Westwood GenerationCoal · 2.5 MW · built
- Gas project S105, Bucks CountyGas · 1,200 MW · withdrawn
- Gas project G41, Bucks CountyGas · 750 MW · withdrawn
- Gas project G13, Bucks CountyGas · 600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem