SOLAR · PJMHampton Township Solar Farm
Hampton Township Solar Farm is a 17.0 MW solar request withdrawn in the PJM interconnection queue, in Sussex County, New Jersey, connecting to JCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2010 (completed)
- Withdrawn / abandonedMar 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W3-145
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- JCPL
- Connection point (POI)
- Branchville-Newton 34.5kV
- Location
- Sussex County, New Jersey
- Technology
- Solar: 17.0 MW
- Total requested
- 17.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 29 October 2010
- Proposed online date
- September 2014
- Withdrawn
- March 2015
Location
Marker shows the centre of Sussex County; the queue data does not give exact sites.
Power plants in New Jersey · Transmission lines in New Jersey
Other requests in Sussex County
- Houses Corner StorageBattery storage · 20.0 MW · agreement signed
- Solar project AI1-122, Sussex CountySolar · 5.9 MW · in study
- Viridity Energy Solutions Montague StorageBattery storage · 20.0 MW · built
- VESI ‚Äì Andover Energy StorageBattery storage · 19.8 MW · built
- Frankford Solar FarmSolar · 10.0 MW · built
- Beaver Run Solar FarmSolar · 9.9 MW · built
- Roy Road Battery Storage FacilityBattery storage · 8.0 MW · built
- Wantage Solar FarmSolar · 7.5 MW · built
- Roy Road Battery Storage FacilityBattery storage · 6.0 MW · built
- Sussex County Land FillOther · 3.4 MW · built
- Augusta Solar FarmSolar · 3.0 MW · built
- Durban Ave SolarSolar · 1.3 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem