United States › Grid › Interconnection queues › Pennsylvania

SOLAR · PJM

Philipsburg-Clarence 34.5 kV

Philipsburg-Clarence 34.5 kV is a 20.0 MW solar request built and operating in the PJM interconnection queue, in Clearfield County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Mar 2019 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AE2-129
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Philipsburg-Clarence 34.5 kV
Location
Clearfield County, Pennsylvania
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Operational
Entered queue
1 March 2019
Proposed online date
November 2022
Came online
January 2023

Location

Marker shows the centre of Clearfield County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Clearfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem