United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTCold Creek Solar
Cold Creek Solar is a 455 MW solar request withdrawn in the ERCOT interconnection queue, in Schleicher County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2022 (completed)
- Withdrawn / abandonedFeb 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0263
- Grid region
- ERCOT (Texas)
- Developer
- Cold Creek Solar LLC
- Connection point (POI)
- 76003 Big Hill Substation 345kV
- Location
- Schleicher County, Texas
- Technology
- Solar: 455 MW
- Total requested
- 455 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 17 April 2022
- Proposed online date
- December 2026
- Withdrawn
- February 2025
Location
Marker shows the centre of Schleicher County; the queue data does not give exact sites.
Other requests in Schleicher County
- Cold Creek Solar 2Solar + storage Β· 445 MW Β· agreement signed
- Rockefeller StorageBattery storage Β· 207 MW Β· agreement signed
- Cold Creek Storage 2Solar + storage Β· 174 MW Β· agreement signed
- Sombrero SolarSolar Β· 352 MW Β· in study
- Live Oak Wind IIOnshore wind Β· 303 MW Β· in study
- Easy Wind Energy CenterWind + storage Β· 241 MW Β· in study
- Easy Battery Energy Storage CenterWind + storage Β· 200 MW Β· in study
- Cashel BESSBattery storage Β· 150 MW Β· in study
- Proving Ground SolarSolar + storage Β· 82.1 MW Β· in study
- Tipperary SolarSolar Β· 60.2 MW Β· in study
- Proving Ground BESSSolar + storage Β· 51.4 MW Β· in study
- Rockefeller SolarSolar Β· 208 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem