United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OTHER Β· SOUTHEAST

Other project 120, Lake County

Other project 120, Lake County is a 110 MW other request withdrawn in the Southeast interconnection queue, in Lake County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
120
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Enola Substation
Location
Lake County, Florida
Technology
Other: 110 MW
Total requested
110 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
19 June 2013
Proposed online date
July 1993

Location

Marker shows the centre of Lake County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem