OTHER Β· SOUTHEASTOther project 120, Lake County
Other project 120, Lake County is a 110 MW other request withdrawn in the Southeast interconnection queue, in Lake County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 120
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Enola Substation
- Location
- Lake County, Florida
- Technology
- Other: 110 MW
- Total requested
- 110 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 19 June 2013
- Proposed online date
- July 1993
Location
Marker shows the centre of Lake County; the queue data does not give exact sites.
Other requests in Lake County
- Gas project 9, Lake CountyGas Β· 662 MW Β· withdrawn
- Gas project 23, Lake CountyGas Β· 597 MW Β· withdrawn
- Gas project 22, Lake CountyGas Β· 597 MW Β· withdrawn
- Gas project 21, Lake CountyGas Β· 597 MW Β· withdrawn
- Solar project 113, Lake CountySolar Β· 100 MW Β· withdrawn
- Solar project 192, Lake CountySolar Β· 25.0 MW Β· withdrawn
- Solar project 188, Lake CountySolar Β· 20.0 MW Β· withdrawn
- Other project 122, Lake CountyOther Β· 15.7 MW Β· withdrawn
- Other project 127, Lake CountyOther Β· 11.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem