United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J3253, Woodruff County
Solar project J3253, Woodruff County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Woodruff County, Arkansas, connecting to ARKANSAS ELECTRIC COOPERATIVE CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3253
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ARKANSAS ELECTRIC COOPERATIVE CORPORATION
- Connection point (POI)
- Bailey
- Location
- Woodruff County, Arkansas
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 26 March 2024
- Proposed online date
- June 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Woodruff County; the queue data does not give exact sites.
Other requests in Woodruff County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem