πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR Β· MISO

Solar project J3253, Woodruff County

Solar project J3253, Woodruff County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Woodruff County, Arkansas, connecting to ARKANSAS ELECTRIC COOPERATIVE CORPORATION.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3253
Grid region
MISO (Midcontinent)
Utility / transmission owner
ARKANSAS ELECTRIC COOPERATIVE CORPORATION
Connection point (POI)
Bailey
Location
Woodruff County, Arkansas
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
26 March 2024
Proposed online date
June 2028
Withdrawn
September 2025

Location

Marker shows the centre of Woodruff County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Woodruff County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem