SOLAR Β· MISOSolar project J894, Woodruff County
Solar project J894, Woodruff County is a 45.0 MW solar request withdrawn in the MISO interconnection queue, in Woodruff County, Arkansas, connecting to Entergy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J894
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Entergy
- Connection point (POI)
- McCrory - Moses 161kV Substation
- Location
- Woodruff County, Arkansas
- Technology
- Solar: 45.0 MW
- Total requested
- 45.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- April 2020
- Withdrawn
- January 2019
Location
Marker shows the centre of Woodruff County; the queue data does not give exact sites.
Other requests in Woodruff County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem