United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2022-041, Cowley County
Solar project GEN-2022-041, Cowley County is a 100 MW solar request withdrawn in the SPP interconnection queue, in Cowley County, Kansas, connecting to GHP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-041
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- GHP
- Connection point (POI)
- Tie Substation 69 kV
- Location
- Cowley County, Kansas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 June 2022
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- March 2025
Location
Marker shows the centre of Cowley County; the queue data does not give exact sites.
Other requests in Cowley County
- Gas project GEN-2020-003, Cowley CountyGas Β· 58.0 MW Β· agreement signed
- Battery storage project GEN-2024-061, Cowley CountyBattery storage Β· 200 MW Β· in study
- Onshore wind project GEN-2011-039, Cowley CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2004-010, Cowley CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2011-002, Cowley CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2011-004, Cowley CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project GEN-2023-121, Cowley CountySolar Β· 50.0 MW Β· withdrawn
- Solar project GEN-2016-173, Cowley CountySolar Β· 42.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem