Solar project TCS-05, Adams County

Solar project TCS-05, Adams County is a 200 MW solar request withdrawn in the West interconnection queue, in Adams County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedAug 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
TCS-05
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Wanapum-Saddle Mountain 230kV line
Location
Adams County, Washington
Technology
Solar: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
Request Status: Withdrawn; Facilities Study: N/A; Phase One Cluster Study: N/A; Phase One Re-Study: N/A; Phase Two Clust
Queue status
Withdrawn
Entered queue
27 November 2018
Proposed online date
December 2020
Withdrawn
August 2022

Location

Marker shows the centre of Adams County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Adams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem