United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OTHER Β· ISO-NE

Generator reactivation

Generator reactivation is a 24.0 MW other request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedMay 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
880
Grid region
ISO-NE (New England)
Connection point (POI)
Emera Maine 46kv Line 5/7 / Old Town Maine @ Penobscot River
Location
Penobscot County, Maine
Technology
Other: 24.0 MW
Total requested
24.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
17 April 2019
Proposed online date
October 2020
Withdrawn
May 2019

Location

Marker shows the centre of Penobscot County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Penobscot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem