United States › Grid › Interconnection queues › Missouri
SOLAR · MISOSolar project J817, Warren County
Solar project J817, Warren County is a 139 MW solar request built and operating in the MISO interconnection queue, in Warren County, Missouri, connecting to Ameren Missouri.
Request details
- Queue ID
- J817
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Warrenton 161kV Substation
- Location
- Warren County, Missouri
- Technology
- Solar: 139 MW
- Total requested
- 139 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: In Service
- Queue status
- Operational
- Entered queue
- 16 June 2017
- Agreement signed
- 17 December 2019
- Proposed online date
- October 2021
- Came online
- October 2021
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Other requests in Warren County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem