Solar project IC-801, Washington County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Washington County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2019 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-801
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- West McIntosh Substation 115 kV Bus
- Location
- Washington County, Alabama
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 7 August 2019
- Withdrawn
- November 2023
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar project IC-831, Washington CountySolar Β· 80.0 MW Β· suspended
- Solar project 25-IC-AW, Washington CountySolar Β· 199 MW Β· withdrawn
- Solar + storage project IC-841, Washington CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project IC-546, Washington CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-473, Washington CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-1135, Washington CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem