United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

SOLAR Β· SOUTHEAST

Solar project IC-546, Washington County

Solar project IC-546, Washington County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Washington County, Alabama, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
IC-546
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Bassett Creek - McIntosh 115 kV Line
Location
Washington County, Alabama
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
28 November 2016
Withdrawn
May 2017

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Alabama Β· Transmission lines in Alabama

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem