United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

COAL Β· MISO

Coal project G589, Black Hawk County

Coal project G589, Black Hawk County is a 750 MW coal request withdrawn in the MISO interconnection queue, in Black Hawk County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2006 (completed)
  2. Withdrawn / abandonedJan 2009 (project stopped here)
  3. ConsentedJan 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G589
Grid region
MISO (Midcontinent)
Connection point (POI)
Hazelton 345 kV Substation
Location
Black Hawk County, Iowa
Technology
Coal: 750 MW
Total requested
750 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
12 January 2006
Agreement signed
5 January 2009
Proposed online date
December 2006
Withdrawn
January 2009

Location

Marker shows the centre of Black Hawk County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Black Hawk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem