ONSHORE WIND Β· MISOOnshore wind project J615, Black Hawk County
Onshore wind project J615, Black Hawk County is a 70.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Black Hawk County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2016 (completed)
- Withdrawn / abandonedOct 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J615
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Electric Farms- Shaulis 161kV
- Location
- Black Hawk County, Iowa
- Technology
- Wind: 70.0 MW
- Total requested
- 70.0 MW
- Study phase
- GIA
- Queue status
- Withdrawn
- Entered queue
- 9 May 2016
- Proposed online date
- August 2018
- Withdrawn
- October 2018
Location
Marker shows the centre of Black Hawk County; the queue data does not give exact sites.