United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project J013, Stutsman County
Onshore wind project J013, Stutsman County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Stutsman County, North Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2009 (completed)
- Withdrawn / abandonedJun 2012 (project stopped here)
- ConsentedJun 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J013
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- OTP Jamestown 115 kV Substation
- Location
- Stutsman County, North Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 6 January 2009
- Agreement signed
- 26 June 2012
- Proposed online date
- December 2012
- Withdrawn
- June 2012
Location
Marker shows the centre of Stutsman County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Stutsman County
- Solar project J3787, Stutsman CountySolar Β· 247 MW Β· in study
- Onshore wind project J2250, Stutsman CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J262, Stutsman CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project J263, Stutsman CountyOnshore wind Β· 100 MW Β· built
- Coal project G645, Stutsman CountyCoal Β· 50.0 MW Β· built
- Coal project G788, Stutsman CountyCoal Β· 49.0 MW Β· built
- Other project G276, Stutsman CountyOther Β· 300 MW Β· withdrawn
- Solar project GEN-2023-144, Stutsman CountySolar Β· 265 MW Β· withdrawn
- Onshore wind project J031, Stutsman CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GI-0909, Stutsman CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project J1990, Stutsman CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GI-0806, Stutsman CountyOnshore wind Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem