United States › Grid › Interconnection queues › Kansas
GAS · SPPGas project GEN-2024-253, Leavenworth County
Gas project GEN-2024-253, Leavenworth County is a 300 MW gas request in interconnection study in the SPP interconnection queue, in Leavenworth County, Kansas, connecting to WERE.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-253
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Stranger Creek - 87th Street 345 kV line
- Location
- Leavenworth County, Kansas
- Technology
- Gas: 300 MW · Battery
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- December 2027
Location
Marker shows the centre of Leavenworth County; the queue data does not give exact sites.
Other requests in Leavenworth County
- Battery storage project GEN-2024-339, Leavenworth CountyBattery storage · 300 MW · in study
- Battery storage project GEN-2024-121, Leavenworth CountyBattery storage · 199 MW · in study
- Gas project GEN-2001-010, Leavenworth CountyGas · 640 MW · withdrawn
- Gas project GEN-2001-009, Leavenworth CountyGas · 640 MW · withdrawn
- Solar project GEN-2018-058, Leavenworth CountySolar · 252 MW · withdrawn
- Solar project GEN-2018-059, Leavenworth CountySolar · 252 MW · withdrawn
- Onshore wind project GEN-2017-123, Leavenworth CountyOnshore wind · 180 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem