United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· MISOSolar project J985, Scott County
Solar project J985, Scott County is a 120 MW solar request withdrawn in the MISO interconnection queue, in Scott County, Missouri, connecting to Ameren Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedJan 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J985
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Miner - Kelso 161kV Line Tap
- Location
- Scott County, Missouri
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- December 2020
- Withdrawn
- January 2020
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Other requests in Scott County
- Solar project J1299, Scott CountySolar Β· 200 MW Β· under construction
- Solar project J1087, Scott CountySolar Β· 200 MW Β· under construction
- Solar project J3442, Scott CountySolar Β· 156 MW Β· in study
- Battery storage project J3690, Scott CountyBattery storage Β· 300 MW Β· withdrawn
- Solar project J1161, Scott CountySolar Β· 100 MW Β· withdrawn
- Solar project J2209, Scott CountySolar Β· 100 MW Β· withdrawn
- Solar project GI-89, Scott CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem