SOLAR Β· SOUTHEASTSolar project GI-89, Scott County
Solar project GI-89, Scott County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Scott County, Missouri, connecting to Associated Electric Cooperative, Incorporated.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-89
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Associated Electric Cooperative, Incorporated
- Connection point (POI)
- Morley 161 kV
- Location
- Scott County, Missouri
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 23 January 2020
- Proposed online date
- December 2022
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Other requests in Scott County
- Solar project J1299, Scott CountySolar Β· 200 MW Β· under construction
- Solar project J1087, Scott CountySolar Β· 200 MW Β· under construction
- Solar project J3442, Scott CountySolar Β· 156 MW Β· in study
- Battery storage project J3690, Scott CountyBattery storage Β· 300 MW Β· withdrawn
- Solar project J985, Scott CountySolar Β· 120 MW Β· withdrawn
- Solar project J1161, Scott CountySolar Β· 100 MW Β· withdrawn
- Solar project J2209, Scott CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem