United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2015-084, Harmon County
Solar project GEN-2015-084, Harmon County is a 51.3 MW solar request withdrawn in the SPP interconnection queue, in Harmon County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2015 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-084
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Hollis 138 kV Substation
- Location
- Harmon County, Oklahoma
- Technology
- Solar: 51.3 MW
- Total requested
- 51.3 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 September 2015
- Proposed online date
- December 2018
- Withdrawn
- January 2019
Location
Marker shows the centre of Harmon County; the queue data does not give exact sites.
Other requests in Harmon County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem