United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMSouth Anna Unit 2
South Anna Unit 2 is a 20.0 MW gas request withdrawn in the PJM interconnection queue, in Orange County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2007 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S98
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- South Anna 230kV
- Location
- Orange County, Virginia
- Technology
- Gas: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 31 July 2007
- Proposed online date
- June 2013
- Withdrawn
- July 2012
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Battery storage project AI2-040, Orange CountyBattery storage Β· 75.0 MW Β· in study
- Pine Glade SolarSolar Β· 62.5 MW Β· built
- Louisa Gas Turbines Units 1 through 5Gas Β· 3.0 MW Β· built
- Gas project AH1-676, Orange CountyGas Β· 1,295 MW Β· withdrawn
- Solar project AG1-288, Orange CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project AG2-608, Orange CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project AG1-502, Orange CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar project AG2-210, Orange CountySolar Β· 70.0 MW Β· withdrawn
- Battery storage project AG1-289, Orange CountyBattery storage Β· 53.4 MW Β· withdrawn
- Solar + storage project AG2-609, Orange CountySolar + storage Β· 40.0 MW Β· withdrawn
- Battery storage project AE1-010, Orange CountyBattery storage Β· 33.0 MW Β· withdrawn
- Solar + storage project AG1-503, Orange CountySolar + storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem