SOLAR Β· PJMSolar project AG2-210, Orange County
Solar project AG2-210, Orange County is a 70.0 MW solar request withdrawn in the PJM interconnection queue, in Orange County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-210
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Location
- Orange County, Virginia
- Technology
- Solar: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 5 March 2021
- Proposed online date
- June 2024
- Withdrawn
- March 2021
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Battery storage project AI2-040, Orange CountyBattery storage Β· 75.0 MW Β· in study
- Pine Glade SolarSolar Β· 62.5 MW Β· built
- Louisa Gas Turbines Units 1 through 5Gas Β· 3.0 MW Β· built
- Gas project AH1-676, Orange CountyGas Β· 1,295 MW Β· withdrawn
- Solar project AG1-288, Orange CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project AG2-608, Orange CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project AG1-502, Orange CountySolar + storage Β· 80.0 MW Β· withdrawn
- Battery storage project AG1-289, Orange CountyBattery storage Β· 53.4 MW Β· withdrawn
- Solar + storage project AG2-609, Orange CountySolar + storage Β· 40.0 MW Β· withdrawn
- Battery storage project AE1-010, Orange CountyBattery storage Β· 33.0 MW Β· withdrawn
- Solar + storage project AG1-503, Orange CountySolar + storage Β· 20.0 MW Β· withdrawn
- Battery storage project AH1-123, Orange CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem