Louisa Gas Turbines Units 1 through 5

Louisa Gas Turbines Units 1 through 5 is a 3.0 MW gas request built and operating in the PJM interconnection queue, in Orange County, Virginia, connecting to Dominion.

Queue statusOperating
  1. PlanningQueued Nov 2008 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2009 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
U4-009
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Louisa 230kV
Location
Orange County, Virginia
Technology
Gas: 3.0 MW
Total requested
3.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
17 November 2008
Proposed online date
May 2009
Came online
May 2009

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem